Monday, March 20th: Performance Pool Closed from 7:00am - 3:00pm
Burgess Pool will be deconstructing the ADA Chair Lift in the Performance Pool on Monday, March 20th. The Performance Pool ONLY will be closed from 7:00am – 3:00pm. Please be advised there will be significant noise during the construction. Thank you.
Time: 6.00am, 6.45am, 7.30am. Place: Burgess. Distance: Long. Stroke: Free. Rhythm and flow. 3 x 8 minuet swims. Pulling option if you bring your own gear.